• Skip to primary navigation
  • Skip to main content
  • Skip to footer
1460 Broadway, New York, NY 10036
  • About
  • Blog
  • Careers
  • Clients
  • FAQs
  • Resources
  • Team
Tower Water Site Logo

Tower Water

NYC Cooling Tower & HVAC Water Treatment Services

Call Us: 212.518.6475 Toll-Free: 888.539.1559 Schedule Consultation
  • (212) 518-6475
  • Schedule Consultation
  • Cleaning & Water Treatment
    • Assessment
    • Glycol Systems
    • Filtration Solutions
    • HVAC Systems
    • Legionella Compliance
    • Remote HVAC Monitoring
    • Specialty Pipes
    • Sustainable Water Treatment
  • Legionella Compliance
    • Service
      • Prevention
      • Remediation
      • Risk Assessments
      • Sampling
      • Summons & Violations
      • Testing
      • Water Management
    • Industry
      • Educational Facilities
      • Commercial Buildings
      • Healthcare Facilities
      • Residential Buildings
      • Retirement Facilities
      • Heavy Industrial Industry
      • Light Industrial Industry
    • System
      • Cooling Towers
      • Domestic Hot Water
      • Fountains, Water Features & Pools
  • Cooling Tower Services
    • Cleaning
    • Compliance
    • Maintenance
    • Water Treatment
  • Consulting & Estimating
    • Mechanical Estimating
    • Specification Consulting
    • Water Treatment Consulting
  • Resources
    • Forms & Brochures
    • Multimedia
    • SDS & Product Bulletins
    • Training & Education
    • Water Change Calculator
  • About
    • Blog
    • Careers
    • Clients
    • FAQs
    • Team

Tower Water

hvac on a roof of industrial building with blue sky and clouds in the background

December 26, 2022

5 Steps to Properly Protect Your HVAC System For Winter

As the winter sets in, businesses should be prepared by planning their HVAC system maintenance. It’s important to not miss the window between fall and the first winter freeze to complete routine shutdown maintenance prior to winter. Lack of preparation could cost you down the road should an issue arise from the cold. Why Is […]

blog categories iconHVAC Water Treatment

steam boiler in factory

December 19, 2022

Proper Operation of a Steam Boiler

A steam boiler is an important piece of equipment for many industrial and commercial facilities. It is essential that those who operate and maintain these boilers understand how to do so properly in order to ensure safe and efficient operation. Understanding how the pros operate and maintain steam boilers can help you ensure that you […]

blog categories iconBlog

cooling tower at energy generating plant

December 12, 2022

Importance Of Cooling Tower Cleanings

A cooling tower is a key component in most commercial or industrial HVAC systems. In order to do its job properly, a cooling tower must be kept clean at all times. By not properly cleaning a cooling tower, you can cause a number of problems including bacteria growth, decreased efficiency, and reduction in the life […]

blog categories iconCooling Tower Cleaning

sphagnum-moss

December 5, 2022

What is Plant Based Water Treatment (Promoss)

Cooling towers are essential in a building’s HVAC system. These pieces of equipment can be difficult to sustainably manage. With global temperatures rising and the health and safety risks of chemicals coming under increasing scrutiny, other alternatives to water treatment are beginning to blossom. This is why new, plant-based options are emerging that are changing […]

blog categories iconCleaning & Water Treatment

water treatment and boiler room

November 28, 2022

How Do You Measure the Performance of Water Treatment and Water Treatment Services

Measuring the performance of water treatment and water treatment services can be a daunting task. There are many factors to consider, and depending on your building, the type of service needed will differ depending on your unique needs. However, with the help of a professional water treatment expert, it can be done effectively. What are […]

blog categories iconCleaning & Water Treatment

technician is checking air conditioner

November 28, 2022

How to Prepare an HVAC System for Build-Outs or New Construction

Every building will need renovations or add-ons at some point in time, so it’s important to ensure that your HVAC installation is prepped and ready for this process. If you don’t take the time to prepare your cooling system, it could struggle with demand, experience clogging, and create preventable damage that could lead to expensive […]

blog categories iconHVAC Water Treatment

reverse osmosis system for water drinking plant

November 21, 2022

How Did Your Water Treatment Company Perform This Cooling Season?

Is your cooling tower running at its highest efficiency? More importantly, is your water treatment company doing everything it should be in order to save you time and money? Cooling tower maintenance is a critical part of keeping your business running smoothly. Unfortunately, many businesses don’t take the time to properly maintain their cooling towers, […]

blog categories iconCooling Tower Cleaning

gas boilers in gas boiler room for steam production

November 14, 2022

Are Your Steam Boilers Ready for Winter?

As winter quickly approaches, many businesses are starting to prepare their HVAC systems for the pressure of the oncoming cold weather. This often includes making sure that boilers are in good working order. Boilers are an essential part of any business’ heating and cooling system, and it’s important to ensure they’re ready for winter before […]

blog categories iconBlog

book with diagnosis legionnaires disease

November 7, 2022

What You Need to Know About Legionnaires Disease

In 2022, there have been several reports of Legionnaires’ disease throughout different buildings in NYC. Legionnaires’ disease can be a serious problem in New York City due to the fact that HVAC systems in buildings can easily become breeding grounds for this potentially deadly bacteria. This is one of the main reasons why having professional […]

blog categories iconLegionella Prevention

  • « Go to Previous Page
  • Go to page 1
  • Interim pages omitted …
  • Go to page 3
  • Go to page 4
  • Go to page 5
  • Go to page 6
  • Go to page 7
  • Interim pages omitted …
  • Go to page 28
  • Go to Next Page »

Sign Up For Our Newsletter

Footer

Tower Water

Headquarters 5 Shirley Avenue Somerset, NJ 08873 New York City 1460 Broadway New York, NY 10036 Direct: (212) 518-6475 Toll-Free: (888) 539-1559
Schedule Consultation

Cleaning & Water Treatment

  • Assessment
  • Glycol Systems
  • Filtration Solutions
  • HVAC Systems
  • Legionella Compliance
  • Remote HVAC Monitoring
  • Specialty Pipes
  • Sustainable Water Treatment

Legionella Compliance

  • Prevention
  • Remediation
  • Risk Assessments
  • Sampling
  • Water Management Plans
  • Summons & Violations
  • Testing

Cooling Tower Services

  • Cleaning
  • Compliance
  • Maintenance
  • Water Treatment

Locations

  • New York City
  • New Jersey
  • New York State
  • Boston

© 2023 Tower Cleaning Plus, Inc. · Powered by 321 Web Marketing · Website Privacy Policy & Terms of Use

Popup Modal: Newsletter Signup

Tower Water Favicon

Before you go — sign up for our FREE
water treatment newsletter!

Don't miss out and stay up-to-date with our seasonal maintenance tips and industry news.

"*" indicates required fields