• Skip to primary navigation
  • Skip to main content
  • Skip to footer
1460 Broadway, New York, NY 10036
  • About
  • Blog
  • Careers
  • Clients
  • FAQs
  • Resources
  • Team
Tower Water Site Logo

Tower Water

NYC Cooling Tower & HVAC Water Treatment Services

Call Us: 212.518.6475 Toll-Free: 888.539.1559 Schedule Consultation
  • (212) 518-6475
  • Schedule Consultation
  • Cleaning & Water Treatment
    • Assessment
    • Glycol Systems
    • Filtration Solutions
    • HVAC Systems
    • Legionella Compliance
    • Remote HVAC Monitoring
    • Specialty Pipes
    • Sustainable Water Treatment
  • Legionella Compliance
    • Service
      • Prevention
      • Remediation
      • Risk Assessments
      • Sampling
      • Summons & Violations
      • Testing
      • Water Management
    • Industry
      • Educational Facilities
      • Commercial Buildings
      • Healthcare Facilities
      • Residential Buildings
      • Retirement Facilities
      • Heavy Industrial Industry
      • Light Industrial Industry
    • System
      • Cooling Towers
      • Domestic Hot Water
      • Fountains, Water Features & Pools
  • Cooling Tower Services
    • Cleaning
    • Compliance
    • Maintenance
    • Water Treatment
  • Consulting & Estimating
    • Mechanical Estimating
    • Specification Consulting
    • Water Treatment Consulting
  • Resources
    • Forms & Brochures
    • Multimedia
    • SDS & Product Bulletins
    • Training & Education
    • Water Change Calculator
  • About
    • Blog
    • Careers
    • Clients
    • FAQs
    • Team

Getting Your Cooling Tower Ready for Winter: When to Start

November 20, 2023, by Tower Water

Snowy winter street with winter buildings with cooling tower winter operationAs temperatures start to dip and winter looms on the horizon, building owners and managers face the essential task of preparing their cooling towers for the coming cold season to help ensure their longevity. The transition from summer to winter brings a unique set of challenges and considerations for you to ensure the efficient and safe operation of these cooling systems year-round.

Understanding the significance of timely and proper maintenance can save your facility from costly repairs and downtime. Starting the cooling tower winter operation at the right time is vital, not simply for preserving the integrity of the cooling towers but also for helping to maintain optimal performance throughout the colder months.

This article is designed to guide you, the caretakers of these vital systems, through the essential steps and timelines for comprehensively winterizing your cooling towers. By outlining the key tasks and checkpoints in the cooling tower winter operation, from inspecting and cleaning components to adjusting water treatment protocols and implementing freeze protection strategies, you can better determine if this essential task should be managed with your staff or delegated to an experienced tower water services provider.

Importance of Seasonal Maintenance Across Geographies

Cooling tower on roof top of building. Industrial air cooling system. Air chiller. Unit of air conditioner. Air cooled chiller with piping system on rooftop of building. Cooling tower outside buildingRegardless of the geographical location, most cooling tower manufacturers advocate for annual or semi-annual cleaning. This type of routine preventative maintenance is essential for the optimal efficiency of heat exchange surfaces, along with helping to control energy costs and even extending the equipment’s lifespan as a whole.

While colder climates may tend to demand more urgent winterization steps, even warmer regions benefit significantly from regular maintenance to help prevent potential microbial buildup and help ensure peak functionality.

The Key Steps in Preparing for Winter

The optimal period for preparing cooling towers for winter is during the seasonal transition. In colder areas, this is important to prevent freezing and bursting of pipes. Draining systems is a fundamental step to take, but it’s also a time to implement measures against corrosion, bacteria, and fouling.

Overlooking these aspects can result in efficiency losses, increased energy costs, more frequent maintenance needs, shortened equipment life, and significant health risks due to bacterial growth, particularly legionella.

Specific Processes for Winterizing Cooling Towers

There are specific processes you should go through for effectively winterizing your cooling towers, which include the following steps and considerations:

Cleaning and Inspection Protocols

  • Distribution Box Maintenance: Inspect and clean the distribution box, ensuring ports are clear and free of debris.
  • Spray Nozzle Check: Ensure spray nozzles are unobstructed for optimal functionality.
  • Tower Fill Maintenance: Clean the tower fill to remove scale or debris, replacing damaged parts as needed.
  • Sump Cleaning: Thoroughly clean the tower sump and, if applicable, indoor pit or sump tanks to eliminate sediment and prevent corrosion.
  • Heat Exchanger Maintenance

  • Drain and open heat exchangers for inspection.
  • Remove foreign materials and repair any detected issues.
  • Ensure the end bells are removed, and exchange tubes are cleaned.

Addressing Scale and Corrosion

In cases where scale or corrosion is evident, you can use premium descaling agents to help cleanse the system. However, discovering poor water chemistry control may necessitate reevaluating your water treatment strategies.

Ultimately, continuous injection treatments can ensure the right concentration is maintained throughout the cooling season.

The Scope of Winterization

Winterization of cooling towers is a universal requirement, applicable to various types of facilities ranging from commercial buildings to medical campuses, and even industrial cooling towers, which may operate continuously, requiring annual or semi-annual maintenance as part of sound preventive practices. Ensuring these systems are well-maintained is essential for their efficiency, safety, and longevity, transcending climate and facility size considerations.

The tops of modern corporate buildings needing cooling tower winter operationIt’s important to remember that the investment in winterization actively helps protect the physical equipment while simultaneously helping to uphold the operational continuity of your facility throughout the year.

Ensuring You’re Set For the Winter Season

The process of winterizing cooling towers is an essential task that extends far beyond the mere preservation of equipment—it’s about safeguarding the efficiency, safety, and longevity of these ever-important systems, irrespective of your facility’s particular location or size.

Growing from a small family-owned business to a reputable regional company, Tower Water has maintained its dedication to providing a personal touch in all its services. Our team of knowledgeable professionals is committed to guiding and assisting you in ensuring that your cooling tower and chiller operate at peak performance, especially during the summer months.

Specializing in comprehensive water treatment solutions, Tower Water aims to meet all your various needs through a single, sophisticated provider. We believe in building long-lasting relationships with our clients by offering customized solutions that are carefully tailored to address your specific challenges. Our approach isn’t just about solving problems—it’s about understanding your unique situation and developing targeted strategies that work for you.

Contact Tower Water today at 1-212-518-6475 or schedule a consultation online to discover how our water treatment services can benefit your facility.

blog categories iconBlog

Have A Question? Reach out!

  • This field is for validation purposes and should be left unchanged.

Sign Up For Our Newsletter

Footer

Tower Water

Headquarters 5 Shirley Avenue Somerset, NJ 08873 New York City 1460 Broadway New York, NY 10036 Direct: (212) 518-6475 Toll-Free: (888) 539-1559
Schedule Consultation

Cleaning & Water Treatment

  • Assessment
  • Glycol Systems
  • Filtration Solutions
  • HVAC Systems
  • Legionella Compliance
  • Remote HVAC Monitoring
  • Specialty Pipes
  • Sustainable Water Treatment

Legionella Compliance

  • Prevention
  • Remediation
  • Risk Assessments
  • Sampling
  • Water Management Plans
  • Summons & Violations
  • Testing

Cooling Tower Services

  • Cleaning
  • Compliance
  • Maintenance
  • Water Treatment

Locations

  • New York City
  • New Jersey
  • New York State
  • Boston

© 2023 Tower Cleaning Plus, Inc. · Powered by 321 Web Marketing · Website Privacy Policy & Terms of Use

Popup Modal: Newsletter Signup

Tower Water Favicon

Before you go — sign up for our FREE
water treatment newsletter!

Don't miss out and stay up-to-date with our seasonal maintenance tips and industry news.

"*" indicates required fields